
All ProjectsSolar Installation
Bilal Wahaid Flour Mill
Sadiqabad, PUNJAB
450 KWp
Commissioned September 2023
Industrial
Project Gallery

1 / 2
Multiple Images
Project Overview
The project was executed with precision under Beacon Energy Pvt Ltd as EPC, with Green Fuel Energy (GFE) as the trusted subcontractor. From design to installation, the team delivered a solar solution marked by quality and dedication.
Key Highlights
- FE (Subcontractor) delivered a rooftop solar solution featuring durable aluminum structures, optimized panel layout, and efficient energy generation for seamless operations
Project Details
- Client
- Beacon Energy (Pvt.) Limited
- Sector
- Industrial
- System Type
- Solar PV
- Capacity
- 450 KWp
- Location
- Sadiqabad, PUNJAB
- Commissioned
- September 2023