Afzal Shah Flour Mill
All ProjectsSolar Installation

Afzal Shah Flour Mill

Rahim Yar Khan, PUNJAB
500 KWp
Commissioned March 2024
Industrial
Project Gallery
Afzal Shah Flour Mill image 1
1 / 1
Multiple Images
Project Overview

A 500 kWp solar installation for Afzal Shah Flour Mill, supporting the facility’s high energy demand with clean and reliable solar power. The system was designed to improve energy efficiency, reduce electricity costs, and ensure stable operations for continuous industrial production.

Key Highlights
  • 80% of the facility’s annual energy demand
  • Provides annual CO₂ savings of ~ 490 tons annually
  • Delivered under Turnkey EPC (Design, Supply, Installation & Commissioning).
Project Details
Client
Beacon Energy (Pvt.) Limited
Sector
Industrial
System Type
Solar PV
Capacity
500 KWp
Location
Rahim Yar Khan, PUNJAB
Commissioned
March 2024